no
Patent Application Encyclopedia
Is Nigerian Invention Patent Application Type Convertible?
Can the priority right of the UAE invention patent application be restored?
Accept priority restoration. Please consult ICPR for specific applicable standards and charges.
Who is the competent authority for patent applications in the Netherlands?
Netherlands Ministry of Commerce
English: Netherlands Patent Office, Abbreviation: RVO
Website: www.rvo.nl/octrooien
Dutch invention patent search: Zoeken in octrooien (rvo.nl)
Is it possible to apply for a combined appearance in a Saudi Arabian industrial design application
yes. Multiple designs may be included in one Saudi Arabian design application, provided that the designs belong to the same class in the International Design Classification.
List of PCT Priority Time Limits
Deadlines for entering the national/regional phase under Chapters I and II of the PCT Treaty
(Monthly from priority date)
(Status as of June 7, 2022)For detailed information on extensions of deadlines in specific designated/elected Offices, see the corresponding national chapters of the PCT Applicant's Guide.
Designated Office/Elected Office Chapter I
(under Article 22 of the PCT Treaty )Chapter II
(under Article 39(1) of the PCT Treaty )AE united arab emirates 30 30 AG Antigua and Barbuda 30 30 AL Albania 1 31 31 AM Armenia 2 31 31 AO Angola 30 30 AP ARIPO4 31 31 AT Austria 1 30 30 AU Australia 31 31 AZ Azerbaijan 2 30 31 BA bosnia and herzegovina 34 34 BB Barbados 30 30 BG Bulgaria 1 31 31 BH Bahrain 30 30 BN Brunei Darussalam 30 30 BR Brazil 30 30 BW Botswana 6 31 31 BY Belarus 2 31 31 BZ Belize 30 30 7 CA Canada 30 15 30 15 CH Switzerland 1 , 9 30 30 CL Chile 30 30 CN China 30 (32) 8 30 (32) 8 CO Colombia 31 31 CR costa rica 31 31 CU cuba 30 30 CZ czech 1 31 31 DE Germany 1 31 31 DJ Djibouti 30 30 DK Denmark 1 31 31 DM Dominic 3 30 30 do dominica 30 30 DZ Algeria 31 31 EA Eurasian Patent Organization 31 31 EC ecuador 31 31 EE Estonia 1 31 31 EG Egypt 30 30 EP European Patent Organization10 31 31 ES Spain 1 30 30 FI Finland 1 31 31 GB United Kingdom of Great Britain and Northern Ireland1 31 31 GD Grenada 3 30 30 GE Georgia 31 31 GH Ghana 6 30 30 GM Gambia 6 30 31 GT Guatemala 30 30 HN Honduras 30 30 HR Croatia 1 31 31 HU Hungary 1 31 31 ID Indonesia 31 5 31 5 IL Israel 30 30 IN India 31 31 IQ Iraq 3 30 30 IR Iran (Islamic Republic of) 30 30 IS Iceland 1 31 31 IT italy 1 30 16 30 16 JM jamaica 30 30 JO Jordan 30 30 JP Japan 30 30 KE Kenya 6 30 30 KG Kyrgyzstan 2 31 31 K H Cambodia 30 30 KN Saint Kitts and Nevis 30 30 KP Democratic People's Republic of Korea 30 30 KR Republic of Korea 31 31 KW Kuwait 30 30 KZ Kazakhstan 2 31 31 LA Lao People's Democratic Republic 31 31 LC Saint Lucia 3 30 30 LK Sri Lanka 30 30 LR Liberia 6 30 31 LS Lesotho 6 30 31 LU Luxembourg 1 20 11 30 LY Libya 3 30 30 MA morocco 31 31 MD republic of moldova 31 31 ME Montenegro 3 30 30 MG madagascar 30 30 MK North Macedonia 1 31 31 MN Mongolia 31 31 MW Malawi 6 30 30 MX Mexico 30 30 my Malaysia 30 30 MZ Mozambique 6 31 31 NA Namibia 6 31 31 NG nigeria 30 30 NI nicaragua 30 30 NO Norway 1 31 31 New Zealand new Zealand 31 31 OA African Intellectual Property Organization12 30 30 om Oman 30 30 PA Panama 30 30 PE Peru 30 30 PG Papua New Guinea 31 31 pH the Philippines 30 (31 8 ) 30 (31 8 ) PL Poland 1 30 30 PT Portugal 1 30 30 QA Qatar 30 30 RO Romania 1 30 30 RS Serbia 1 30 13 30 13 RU Russian Federation 2 31 31 RW Rwanda 3 , 6 30 30 SA Saudi Arabia 30 30 SC Seychelles 31 31 SD Sudan 6 30 30 SE Sweden 1 31 31 SG Singapore 30 14 30 14 SK Slovakia 1 31 31 SL Sierra Leone 6 31 31 ST Sao Tome and Principe 3 , 6 30 30 SV El Salvador 30 30 Sy Syrian Arab Republic 31 31 TH Thailand 30 30 TJ Tajikistan 2 30 31 tm Turkmenistan 2 30 31 TN Tunisia 30 30 TR Turkey 1 30 (33 8 ) 30 (33 8 ) TT Trinidad and Tobago 30 31 Z United Republic of Tanzania6 21 11 31 UA Ukraine 31 31 UG Uganda 6 30 31 US united states of america 30 30 UZ Uzbekistan 31 31 VC Saint Vincent and the Grenadines 31 31 VN Vietnam 31 31 WS Samoa 31 31 ZA South Africa 31 31 Z M Zambia 6 30 30 ZW Zimbabwe 6 30 31 - If a European patent is designated/elected, the applicable term is found in the information on EP (European Patent Office) as designated/elected Office.
- In case of designation/elected Eurasian patent, the applicable term can be found in the information on EA (Eurasian Patent Office) as designated/elected Office.
- In the absence of information from the Offices concerned, the time limits indicated are those generally applicable under Articles 22(1) and 39(1)(a) of the PCT Treaty. If the Office decides to apply a longer period, the information will be published in the PCT Communications.
- For the following countries which do not operate a designated/elected Office of their own, this Office is designated/elected: SZ.
- This time limit can be extended if the applicant pays an additional fee for late entry into the national phase (see the national phase information below for details).
- If ARIPO patent is designated/elected, the applicable term can be found in the information on AP (ARIPO) as Designated/Elected Office.
- It may be extended upon written request of the applicant.
- The time limit applicable when the applicant pays the additional fee for late national phase entry.
- For the following countries which do not operate a designated/elected Office of their own, this Office is designated/elected: LI.
- For the following countries that do not operate a designated/elected Office of their own, this Office is designated/elected Office: BE, CY, FR, GR, IE, IT, LT, LV, MC, MT, NL, SI, SM .
- The Office had informed the International Bureau that the time limit under Article 22(1) of the PCT Treaty, as amended and entered into force on April 1, 2002, did not apply to it - it did not yet apply the 30-month time limit for entry into the national phase.
- Designated/elected Office for the following countries for which no designated/elected Office operates of its own: BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR , NE, SN, TD, TG.
- This time limit may be extended by 30 days if the applicant pays an additional fee for late entry into the national phase.
- This period can be extended by up to 18 months on payment of the prescribed fee by the applicant (see National Phase Information for details).
- After the 30-month period (30 months from the priority date), the applicant may request restoration of the rights within 12 months, provided that the restoration fee is paid and the Canadian Patent Rules 154(3 ) with respect to (delay of national phase entry) other requirements for reinstatement of rights.
- Applicable to international applications filed on or after 1 July 2020.
How long does it take for a utility model application to be granted in Vietnam?
1 year
What are the requirements for Polish industrial design application documents
Filing Language: Polish
Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Patent application fee payment certificate
How long is the deadline for industrial design applications in Mexico?
- via Paris Convention : 6 months from earliest priority date.
- Hague Agreement route: 6 months from earliest priority date.
How many years is the protection period of a Turkish invention patent application
20 years
Whether the utility model application in Chile can be type-converted
no
Can India's industrial design priority be restored?
no
Whether the application for a Thai invention patent can be type-converted
yes. Patent applicants can change the patent type from invention to petty patent (utility model) before the patent application is granted. The converted patent application has the filing date of the original patent application.
Can Nigerian invention patent application priority be restored?
yes. Please consult IPONIGERIA for applicable standards and charges.
Is the design application in Sweden convertible?
no
What are the requirements for the Romanian invention patent application documents?
Filing Language: Romanian
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Deposited Receipt of Microorganism and Translation thereof
- Viability Statement of Microorganism and Translation thereof
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Notification issued by CNIPA notify the applicant the application has passed through the security review
*Romania patent application documents need notarization
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Amendments under Art. 19/34/28/41 at the time of the national phase entry
- Sequence Listing (PDF format and TXT format)
- Deposited Receipt of Microorganism and Translation thereof
- Viability Statement of Microorganism and Translation thereof
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
Assignment for Patent Right Transfer
*Romania patent application documents need notarization
Which is the competent authority for utility model patent applications in Russia?
Russian Federal Office for Intellectual Property
English: Federal Service for Intellectual Property, ROSPATENT
Website: rospatent.gov.ru
Russian utility patent search: Home (fips.ru)
Instructions for authorization of utility model application and annual fee in Portugal
- Licensing Fee: None.
- Annuity: From the 5th year onwards from the date of application, it will be paid year by year. The application fee includes annual fees for the first and second years. There is no annual fee for the third and fourth years, but the applicant needs to notify INPI for renewal in the third and fourth years. All subsequent annual fees must be paid within six months before the date corresponding to the year of application. Overdue annual fees can be paid within a 6-month grace period, and 50% of the annual fee of the current year is required to be paid as a penalty.
Is the design application in the UAE eligible for DAS?
no
Can the priority right of utility model applications be restored in Vietnam?
yes. Please consult IPVN for the standards and charges for restoring the priority.
How long does it take to authorize an industrial design in Korea?
- The average time for partial substantive examination design granted is 1-2 months.
- The average time for substantive examination of design granted is 10-12 months.
Pagination
- Previous page
- Page 40
- Next page