The novelty grace period is 6 months before the filing date/priority date.
Patent Application Encyclopedia
Novelty grace period for utility model applications in France
How long is the deadline for industrial design applications in Mexico?
- via Paris Convention : 6 months from earliest priority date.
- Hague Agreement route: 6 months from earliest priority date.
What are the requirements for the Polish invention patent application documents
Filing Language: Polish
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Polish translation
- Certificate of Microbiological Survival and its Polish translation
- Scanned Copy of Certified Priority Document / DAS
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
- Patent application fee payment certificate
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Polish national phase 19/28/34/41 amended
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Polish translation
- Certificate of Microbiological Survival and its Polish translation
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Patent application fee payment certificate
Features of Nigerian design patent application process
IPONIGERIA conducts only formality examination of designs.
Features of the utility model patent application process in Argentina
IMPI conducts formal and substantive examinations of utility model patent applications. There are three ways to submit an application to INPI: online application, mailing and submitting a written application to INPI in person. No matter which way the application is filed, the application date of the patent is the time when the patent applicant sends the complete patent application text to INPI. IMPI accepts only one independent claim in a utility model application. Applicants are required to pay the substantive examination fee within 3 months from the date of application. The time limit for responding to the Office Action Notice is 3 months from the date of issue, and can be extended 3 times (one month each time). The requirements for utility models are relatively loose, and they need to be novel and practical, but not inventive.
How long is the protection period of industrial design in India?
15 years
How long is the PCT period for Luxembourg invention patent application?
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 20 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of granted of the European invention.
*Luxembourg is one of the only countries in the world that still retain Chapter I for 20 months to enter the national phase (the other is Tanzania). If it takes 30 months to enter the national phase, a request for international preliminary examination must be submitted.
Is a utility model application in Vietnam eligible for DAS?
no
Luxembourg Invention Patent Application Authorization and Annual Fee Instructions
- Authorization Fee: None
- Annuity: pay year by year from the third year from the application date, and the payment deadline for the annual fee is the end of the month corresponding to the application date. If the annual fee is overdue, it can be paid within a grace period of 6 months, and a late fee of 20.00 Euros should be paid at the same time.
How long is the protection period for utility model applications in Malaysia?
10 years, renewable 2 times, 5 years each time, up to 20 years of protection.
Is a design application in India convertible?
no
Bahrain utility model application authorization and annual fee instructions
- Grant fee: The announcement fee includes the granted official fee.
- Annuity: pay year by year from the second year of the application date, and should be paid on the date of the application date. If the annual fee is overdue, it can be paid within a grace period of 6 months, and at the same time pay 160.00 Bahraini dinar (large entity) late fee.
What are the requirements for the Swedish invention patent application documents
Filing Language: Swedish/English
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Swedish/English translation
- Certificate of Microbiological Survival and its Swedish/English translation
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Swedish national phase 19/28/34/41 amended
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Swedish/English translation
- Certificate of Microbiological Survival and its Swedish/English translation
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Power of Attorney
Description of New Zealand Design Authorization and Annual Fee
- Licensing Fee: None.
- Annuity: The patentee is required to renew the design registration within 6 months of the renewal due date. If the annual fee is overdue, it can be paid within a grace period of 6 months, and the penalty should be paid at the same time.
Features of the Hungarian Utility Model Patent Application Process
Utility models in Hungary are subject to formal and substantive examinations, but not novelty and inventive steps.
How long is the PCT deadline for utility model applications in Japan?
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
Novelty Grace Period for Utility Model Applications in the UAE
not applicable.
What are the requirements for utility model application documents in Türkiye?
Filing Language: Turkish
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
- Proof of payment of application fee
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Turkish national phase 19/28/34/41 amended
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Proof of payment of application fee
How many years is the protection period of Bulgarian invention patent application
20 years
Instructions for Authorization of Utility Model Application and Annual Fee in Indonesia
- Authorization Fee: None
- Annuity: The applicant should pay the annual fee from the first year to the year of granted in one lump sum within 6 months from the date of granted (calculated from the date of application). Then the annual fee is paid year by year, and the deadline is one month before the application date of each year. If the annual fee is overdue, it can be paid within a grace period of 12 months, and a penalty should be paid at the same time.
Pagination
- Previous page
- Page 54
- Next page