If the disclosure is caused by the inventor or the information source of the discloser is the inventor; or if the disclosure occurs again after being disclosed by the above-mentioned subject, the patent enjoys a novelty grace period within 12 months before the filing date/priority date.
Patent Application Encyclopedia
Novelty Grace Period for U.S. Industrial Design Applications
Is a Colombian utility model application convertible?
no
How long does it take to grant an invention patent application in Uruguay?
8-10 years
Which is the competent authority for utility model applications in Bahrain?
Bahrain Industrial Property Council
English: Ministry of Industry and Commerce, abbreviation: MOIC
Website: Home (moic.gov.bh)
Bahrain Utility Model Patent Search: WIPO - Search International and National Patent Collections
Is a utility model application in Finland eligible for DAS?
yes
Is a utility model application in Chile eligible for DAS?
yes
Whether an Austrian industrial design application can apply for a combined appearance
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.
Features of the utility model patent application process in Vietnam
IPVN conducts formality examination and substantive examination of utility model patents. IPVN has no restrictions on the fields of utility model patent applications. Utility models can be applied for in all fields covered by inventions, but all utility models will undergo substantive examination. A patent applicant/anyone needs to file a substantive request no later than 36 months from the filing date.
Is the design application in Austria convertible?
no
Is it possible to apply for a combined appearance for an industrial design application in Taiwan, China?
no
Can Austrian invention patent application priority be restored?
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
Novelty Grace Period for Philippine Design Applications
The novelty grace period is 6 months before the filing date/priority date.
Is DAS available for Indonesian industrial design application?
no
Can the priority right of utility model applications in the UAE be restored?
Accept priority restoration. Please consult ICPR for specific applicable standards and charges.
How long is the deadline for Uruguay industrial design application
via Paris Convention : 6 months from earliest priority date.
Bulgarian utility model application authorization and annual fee instructions
- Grant fee: It must be paid together with the granted announcement fee within one month from the receipt of the granted notice.
- Annuity: pay year by year from the first year of the application date, and should be paid before the last day of the month of the application date at the latest, not exceeding one patent year, and the annual fee can be paid within a grace period of 6 months if it is overdue, and paid at the same time 200% late fee.
How long does it take to authorize an industrial design in Denmark?
4 weeks
Features of the design patent application process in Costa Rica
RIP only conducts formality examination of design patent applications. After the formality examination is passed, the opposition period will enter. If there is no opposition, the patent application will be authorized.Features of Colombian design patent application process
Appearance does not require a request for review. The Colombian Patent Office will not conduct a novelty examination unless a third party opposes the design application within 30 working days of its publication.
Features of the Bulgarian design patent application process
The BPO conducts formality examination of design patent applications.