- Licensing Fee: None.
- Annuity: pay year by year from the first year from the date of application, and the applicant should pay the fee within 3 months before the expiration of the annual fee period. Overdue payment can be made within 3 months after the due date, and there is no need to pay the penalty. If the penalty is paid, it can be extended for another 3 months.
- Is the utility model application in the UAE convertible?
- Novelty Grace Period for Utility Model Applications in the UAE
- Whether the UAE invention patent application can be DAS
- How long is the protection period of the UAE invention patent application
- How long does it take to authorize an industrial design in the UAE?
- Explanation of Design Authorization and Annual Fees in the United Arab Emirates
- How long does it take for the UAE utility model application to be authorized?
- Is the design application in the UAE convertible?
- Is a utility model application in the UAE eligible for DAS?
- How long is the protection period of the design in the United Arab Emirates?