- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: 3 months from the date of European patent grant.
yes
The PPO only conducts formality examination of utility model patent applications, only examines novelty and industrial applicability, and does not examine inventive step.
- Grant fee: The applicant should pay the granted official fee, announcement fee and the first annual fee (that is, the annual fee for the first to third years) within 3 months after receiving the notification of the granted decision.
- Annuity: The applicant needs to pay the annual fee for the next stage in the sixth year and the eighth year respectively. Overdue annual fee can be paid within a grace period of 6 months. At the same time, 30% of the annual fee of the current year will be paid as a penalty.
10 years
If disclosed by the author or his successor, the novelty grace period shall be enjoyed within 12 months after the first disclosure.
The PPO conducts formal and substantive examinations of invention patent applications. There is no need to file a request for substantive examination, and the substantive examination starts automatically.
yes. An invention applicant may propose to change the type of invention from an invention to a utility model during the process of examining the application or within two months from the date of the final decision on the refusal to grant a patent. The utility model application shall be deemed to have been filed from the date of the invention application. A utility model application converted from an invention must fully meet the requirements for utility model documents.
Filing Language: Polish
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
- Patent application fee payment certificate
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Polish national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Patent application fee payment certificate
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: 3 months from the date of European patent grant.
The PPO only conducts formality examination of the design, and does not examine novelty and uniqueness.