Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian patent search for inventions: National Patents Search (patentamt.at)
If within 12 months before the filing of the design patent application, due to the disclosure of the designer or its former right holder, the novelty grace period can be enjoyed.
20 years. Patented medicines and plant protection new varieties can obtain an additional 5-year renewal period, and children's medicines can obtain an additional half-year patent protection period.
- Authorization Fee: None
- Annuity: The annual fee is paid every 5 years. The overdue annual fee can be paid within a grace period of up to six months after the due date, and a 20% late fee will be paid at the same time. Pay within the first 3 months of the grace period with no late fees.
- Authorization Fee: None
- Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.
The initial protection is 5 years, which can be renewed 4 times for a maximum protection of 25 years.
via Paris Convention : 12 months from earliest priority date.
via Nationalization of PCT : 30 months from the earliest priority date.
Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Filing Language: German
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the German national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
ATPO only conducts formality examination of design patent applications.
11 months. If an expedited request is made, granted can be obtained in about 3-4 months.
Filing Language: German Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer