- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 31 months from earliest priority date.
It is protected for 10 years from the date of application, and can be renewed for 3 times, each time for 5 years, with a maximum protection of 25 years.
- Grant fee: It must be paid together with the granted announcement fee within one month from the receipt of the granted notice.
- Annuity: pay year by year from the first year of the application date, and should be paid before the last day of the month of the application date at the latest, not exceeding one patent year, and the annual fee can be paid within a grace period of 6 months if it is overdue, and paid at the same time 200% late fee.
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 31 months from earliest priority date.
1 month
The BPO only conducts formality examination of utility model patent applications. The formality examination takes 3 months, and the content of the examination includes whether the applied for utility model patent application belongs to the object of protection, the issue of unity, etc. If the granted conditions are met, the patent is authorized.
20 years
The BPO conducts formality examination of design patent applications.
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
The initial protection period is 4 years, which can be extended for two consecutive three years, and the maximum protection period is 10 years.
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 31 months from earliest priority date.
- Validation of European Patent in EPO member states: 3 months from the date of European patent grant