The BPO only conducts formality examination of utility model patent applications. The formality examination takes 3 months, and the content of the examination includes whether the applied for utility model patent application belongs to the object of protection, the issue of unity, etc. If the granted conditions are met, the patent is authorized.
- Is a Bulgarian industrial design application eligible for DAS?
- How long is the PCT deadline for utility model applications in Bulgaria?
- Instructions for Authorization of Industrial Design and Annual Fees in Bulgaria
- How long is the application period for industrial design in Bulgaria?
- How long does it take to grant a Bulgarian invention patent application
- Is a Bulgarian industrial design application convertible?
- What are the requirements for the Bulgarian invention patent application documents
- How long is the protection period of industrial design in Bulgaria?
- Novelty grace period for patent applications for inventions in Bulgaria
- Bulgarian utility model application authorization and annual fee instructions