no
no
PRV only conducts formality examination on design patents. After the design is officially submitted to the PRV, no modification or addition of other designs is allowed. An applicant may request a deferment of publication for up to 6 months from the filing date/priority date, and this request must be made at the same time as the new application is filed.
2 years
none
Reinstatement of priority accepted on grounds of "due care".
no
Filing Language: Swedish/English
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Swedish/English translation
- Certificate of Microbiological Survival and its Swedish/English translation
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Swedish national phase 19/28/34/41 amended
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Swedish/English translation
- Certificate of Microbiological Survival and its Swedish/English translation
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Power of Attorney
- Authorization Fee: There is no granted fee.
- Annuity: Renewal fee is paid every 5 years. Overdue annual fee can be postponed at the latest within a grace period of 6 months after the due date, and a 20% penalty must be paid at the same time.
Filing Language: Swedish/English Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
5 years, renewable 4 times, 5 years each time, up to 25 years of protection.