- Grant fee: The applicant needs to pay the granted fee within 60 days after the granted notice, and the granted fee includes the maintenance fee for the first five-year validity period
- Annuity: The annual fee for the subsequent second five-year validity period can be paid at the same time as the first annual fee, or it can be paid within the first five-year validity period. If the annual fee is overdue, it can be paid within a six-month grace period, and Pay late fees at the same time.
Patent Application Encyclopedia
Instructions for Authorization of Designs and Annual Fees in Chile
Whether the application for a patent for invention in Malaysia can be type-converted
yes. An invention patent application may submit a conversion request within 6 months from the date of issuance of the examination report and pay the corresponding fee. The converted application has the same filing date as the original application.
Is a utility model application eligible for DAS in Portugal?
no
How long is the deadline for industrial design application in Austria?
- via Paris Convention : 6 months from earliest priority date.
- EU route: 6 months from earliest priority date.
- Hague Agreement route: 6 months from earliest priority date.
Is the design application in Uruguay eligible for DAS?
no
What are the requirements for the Chilean invention patent application documents
Filing Language: Spanish
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Spanish translation
- Certificate of Microbiological Survival and its Spanish translation
- Power of Attorney
- Scanned Copy of Certified Priority Document / DAS
- Spanish translation of priority certificate
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Chilean national phase 19/28/34/41 Amendments
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its Spanish translation
- Certificate of Microbiological Survival and its Spanish translation
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Whether the Ukrainian invention patent application can be type-converted
yes. The applicant may request to change the patent type from invention to utility model before the invention patent application is granted.
Which is the competent authority for patent applications for inventions in Belgium?
Belgian Federal Government Intellectual Property Office
English: The Belgian Intellectual Property Office, Abbreviation: IPObel
Website: Intellectual property | FPS Economy (fgov.be)
Belgian invention patent search: Search in the Crossroads Bank for Enterprises (CBE) | CBE Public Search (fgov.be)
Features of Japanese Utility Model Patent Application Process
The JPO conducts formality examination only for utility model patent applications.
Which is the competent authority for utility model patent applications in Japan?
Japan Patent Office
English: Japan Patent Office, abbreviation: JPO
Website: Japan Patent Office (jpo.go.jp)
Japanese Utility Model Patent Search: Japan Platform for Patent Information|J-PlatPat [JPP] (inpit.go.jp)
Novelty grace period for industrial design applications in Sweden
If the design is disclosed by the designer or his representative within 12 months before the filing date, the design will not lose its novelty.
Is a utility model application convertible in Türkiye?
yes. After the applicant pays the corresponding fee, he can apply to change the patent type from invention to utility model.
Uruguay Utility Model Application Authorization and Annual Fee Instructions
- Grant fee: Pay the granted fee within 60 days after granted.
- Annuity: The starting date of the annual fee is the granted date, and the first annual fee is the annual fee for the first to fifth years.
Which is the competent authority for utility model patent applications in Thailand?
Intellectual Property Office of the Ministry of Commerce of Thailand
English: Department of Intellectual Property, abbreviation: DIP
Website: Home (ipthailand.go.th)
Thailand Invention Patent Search: DIP (ipthailand.go.th)
What are the requirements for the Australian invention patent application documents
Filing Language: English
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Microorganism preservation certificate and its English translation
- Microorganism Survival Certificate and Its English Translation
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
- translator statement
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Australian national phase 19/28/34/41 Amendments
- Sequence Listing (PDF format and TXT format)
- Microorganism preservation certificate and its English translation
- Microorganism Survival Certificate and Its English Translation
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- translator statement
Features of the utility model patent application process in Argentina
IMPI conducts formal and substantive examinations of utility model patent applications. There are three ways to submit an application to INPI: online application, mailing and submitting a written application to INPI in person. No matter which way the application is filed, the application date of the patent is the time when the patent applicant sends the complete patent application text to INPI. IMPI accepts only one independent claim in a utility model application. Applicants are required to pay the substantive examination fee within 3 months from the date of application. The time limit for responding to the Office Action Notice is 3 months from the date of issue, and can be extended 3 times (one month each time). The requirements for utility models are relatively loose, and they need to be novel and practical, but not inventive.
Novelty Grace Period for Invention Patent Application in Malaysia
If the invention is disclosed by a third party maliciously, or by the behavior of the applicant or its original right holder, and by the application for a UK patent, the novelty grace period can be enjoyed 12 months before the filing date/priority date
Features of the design patent application process in Bangladesh
DPDT only conducts formality examination of design patent applications, not substantive examination.
What are the requirements for the utility model application documents in Luxembourg?
Filing Language: English/German/French
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Luxembourg national phase 19/28/34/41 amended
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Power of Attorney
- Assignment for Patent Right Transfer
How long is the PCT deadline for utility model applications in Mexico?
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.