- via Paris Convention : 12 months from earliest priority date.
- Validation of European Patent in EPO member states: 3 months from the date of European patent grant.
Patent Application Encyclopedia
How long is the PCT period for Dutch invention patent application
How long does it take to authorize an industrial design in the UK?
10-12 months
What are the requirements for the utility model application documents in Ukraine
Filing Language: Ukrainian
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Ukrainian national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Is a Colombian industrial design application convertible?
no
What are the requirements for Australian design application documents
Filing Language: English Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
How long does it take to authorize an industrial design in Bangladesh?
1 year
How many years is the protection period of the invention patent application in Thailand?
20 years
Whether the design application in Bangladesh can be type-converted
no
Characteristics of Thailand design patent application process
DIP conducts substantive examination of design patent applications, and only examines whether the conditions of novelty and industrial applicability are met.
Features of the Peruvian utility model patent application process
INDECOPI conducts formal and substantive examinations of invention patent applications. The form review takes about 60 days. After submitting a patent application, INDECOPI will first check the application in detail for compliance with defense and atomic energy requirements. The applicant shall reply within 30 working days to the notice of form correction issued by the examiner. Failure to respond or an unsuccessful response to the patent application will be deemed abandoned. The response period may be extended to 60 working days. Within 18 months from the date of application after passing the formality examination, INDECOPI will publish the patent application in the Peruvian Official Gazette, and any third party can raise objections within 60 days from the date of publication of the application. If an objection is raised, INDECOPI will start the objection procedure. The applicant must respond to the objection within 60 days. Within 6 months from the publication date, the applicant must file a request for substantive examination and pay relevant fees to enter the final substantive examination.
Singapore invention patent application authorization and annual fee instructions
- Grant fee: The applicant should submit a request and pay the corresponding fee within 2 months after receiving the granted notice.
- The annual fee shall be paid year by year starting from the fifth year from the date of application, and the grace period for late payment is 6 months.
Instructions for Authorization of Industrial Design and Annual Fees in Bulgaria
- Grant fee: It will be paid together with the granted announcement fee one month after receiving the granted notice, and the payment will be doubled if it is overdue.
- Annuity: The renewal fee payment period is the corresponding date of the application date in the year, and can be paid within the last year of the current validity period. Payment can still be made within 6 months from the overdue date, subject to a penalty.
Novelty grace period for industrial design applications in Japan
The design does not lose its novelty if it is disclosed by the designer in Japan within 12 months from the filing date/priority date.
Whether the design application in Argentina can be type-converted
no
Is the design application in Switzerland convertible?
no
What are the requirements for utility model application documents in Thailand?
Filing Language: Thai
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Business license for company registration or articles of incorporation
*Thailand patent application documents need to be notarized
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Thai national phase 19/28/34/41 amended
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Business license for company registration or articles of incorporation
*Thailand patent application documents need to be notarized
Instructions for Authorization of Industrial Design and Annual Fee in Belgium
- Licensing Fee: None.
- Annuity: The renewal fee is paid every 5 years. If the annual fee is overdue, the payment can be postponed within 6 months after the due date at the latest, but an additional penalty of 12.00 euros is required.
Novelty Grace Period for Invention Patent Application in Nigeria
6 months before the filing date/priority date.
Explanation of Korea Design Authorization and Annual Fee
- Grant fee: The applicant should pay the annual fee for the first to third year within 3 months after receiving the notification of granted decision
- Annuity: Begin to pay year by year from the 4th year, overdue payment can be made within the 6-month grace period after the due date, but a penalty shall be paid, and the amount of the penalty shall not exceed twice the granted fee.
What are the requirements for UK design application documents?
Filing Language: English Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- inventor statement
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- comparison file
Pagination
- Previous page
- Page 49
- Next page