Whether a Mexican industrial design application can apply for a combined appearance

Submitted by 页之码 on

yes

专利申请流程

  • 6-8 months

  • Filing Language: Spanish

    Necessary documents:

    1. Exterior Design Picture (Six Views)
    2. A Brief Description

    Attachments (if any):

    1. Certified Priority Document
    2. Power of Attorney
    3. Certified Priority Document
    4. small entity declaration
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
  • IMPI conducts formal and substantive examinations of utility model patent applications. However, the requirements for substantive examination are relatively loose, only novelty and industrial applicability are required, but innovation is not required.

  • yes

  • yes. As long as the application is not abandoned, the patent type can be converted from invention to utility model within 3 months of filing the invention patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.

  • Filing Language: Spanish

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Deposit of Microorganisms and its Spanish translation
    3. Certificate of Microbiological Survival and its Spanish translation
    4. Scanned Copy of Certified Priority Document / DAS
    5. Power of Attorney
    6. small entity declaration
    7. Declaration of Ownership/Certification of Employment/Assignment of priority
    8. Assignment for Patent Right Transfer
    9. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Mexican national phase 19/28/34/41 Amendments
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Deposit of Microorganisms and its Spanish translation
    6. Certificate of Microbiological Survival and its Spanish translation
    7. Power of Attorney
    8. small entity declaration
    9. Declaration of Ownership/Certification of Employment/Assignment of priority
    10. Assignment for Patent Right Transfer
  • Mexican Institute of Industrial Property

    English: Mexican Institute of Industrial Property, abbreviation: IMPI

    URL: www.impi.gob.mx

    Mexican Invention Patent Search: Search -- FOLLOW (impi.gob.mx)

  • yes. As long as the application is not abandoned, the patent type can be converted from utility model to invention within 3 months of filing the utility model patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.

    • via Paris Convention : 6 months from earliest priority date.
    • Hague Agreement route: 6 months from earliest priority date.
  • Filing Language: Spanish

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Scanned Copy of Certified Priority Document / DAS
    3. Power of Attorney
    4. small entity declaration
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
    7. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Mexican national phase 19/28/34/41 Amendments
    4. Power of Attorney
    5. small entity declaration
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer