- Authorization Fee: None
- Annuity: pay year by year from the third year from the application date, and the payment deadline for the annual fee is the end of the month corresponding to the application date. If the annual fee is overdue, it can be paid within a grace period of 6 months, and a late fee of 20.00 Euros should be paid at the same time.
- Is a utility model application in Luxembourg eligible for DAS?
- Is a Luxembourg design application eligible for DAS?
- Description of Luxembourg utility model application authorization and annual fee
- How long does it take for a utility model application to be granted in Luxembourg?
- What are the requirements for the utility model application documents in Luxembourg?
- How long is the deadline for filing an industrial design application in Luxembourg?
- Can the priority right of Luxembourg invention patent application be restored?
- Novelty grace period for Luxembourg industrial design applications
- Which is the Luxembourg utility model patent authority?
- What are the requirements for the Luxembourg invention patent application documents?