- Grant fee: The applicant should pay the annual fee for the first to third year within 3 months after receiving the notification of granted decision
- Annuity: Begin to pay year by year from the 4th year, overdue payment can be made within the 6-month grace period after the due date, but a penalty shall be paid, and the amount of the penalty shall not exceed twice the granted fee.
no
no
Korean Industrial Property Office
English: Korea Intellectual Property Office, abbreviation: KIPO
Website: Korean Intellectual Property Office (kipo.go.kr)
Korean Invention Patent Search: Integrated Search < SEARCH - KIPRIS Patent Information searching service
no
yes. The type of patent can be changed from invention to utility model within 30 days of receiving the grant/rejection decision, and the corresponding fee should be paid.
Filing Language: Korean
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entering the Korean national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
KIPO conducts formality examination and substantive examination of utility model patent applications, but only needs to meet the standards of novelty and practicality, and does not require inventive step.
no
20 years, and the protection can be extended to 25 years for pesticides or medicines.
- The average time for partial substantive examination design granted is 1-2 months.
- The average time for substantive examination of design granted is 10-12 months.