- Grant fee: should be paid within 3 months after receiving the granted notice
- Annuity: From the 5th year from the filing date, the annual fee should be paid before the filing date of each year. If the annual fee is overdue, the payment can be postponed to a grace period of 6 months, but a penalty of AUD 100.00 is required every month
- Can Australian industrial design priority be restored?
- Instructions for Authorization of Industrial Design and Annual Fee in Australia
- Can the priority right of an Australian invention patent application be restored?
- How long is the application period for industrial design in Australia?
- Whether an Australian industrial design application can be type-converted
- How long does it take to authorize an industrial design in Australia?
- What are the requirements for the Australian invention patent application documents
- Australian invention patent application authorization and annual fee instructions
- Features of Australian design patent application process
- Whether an Australian industrial design application can be DAS