- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
ATPO conducts formality examination and substantive examination of invention patents. The search report will be published together with the patent application within 18 months from the filing date, and the substantive examination will start automatically, and the applicant does not need to file a separate request for substantive examination. It can be authorized if the granted conditions are met.
11 months. If an expedited request is made, granted can be obtained in about 3-4 months.
Filing Language: German
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its German Translation
- Certificate of Microbiological Survival and its German Translation
- Power of Attorney
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Austrian national phase 19/28/34/41 amended
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its German Translation
- Certificate of Microbiological Survival and its German Translation
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Filing Language: German Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
no
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian Utility Model Patent Search: National Patents Search (patentamt.at)
1 month