Can Austrian utility model application priority be restored?

Submitted by 页之码 on

Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.

专利申请流程

  • yes

  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Deposit of Microorganisms and its German Translation
    3. Certificate of Microbiological Survival and its German Translation
    4. Power of Attorney
    5. Scanned Copy of Certified Priority Document / DAS
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer
    8. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Austrian national phase 19/28/34/41 amended
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Deposit of Microorganisms and its German Translation
    6. Certificate of Microbiological Survival and its German Translation
    7. Declaration of Ownership/Certification of Employment/Assignment of priority
    8. Assignment for Patent Right Transfer
  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    5. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the German national phase 19/28/34/41 amended
    4. Power of Attorney
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
    • via Paris Convention : 12 months from earliest priority date.
    • via Nationalization of PCT : 30 months from the earliest priority date.
    • Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
  • yes

  • Filing Language: German

    Necessary documents:

    1. Exterior Design Picture (Six Views)
    2. A Brief Description

    Attachments (if any):

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    • Authorization Fee: None
    • Annuity: After the granted, it will be paid year by year from the 6th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. There is no late fee for the first three months of the late payment period for the first annual fee (i.e. the sixth year).
  • 2 years

  • yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.

  • 1 month