The BPO only conducts formality examination of utility model patent applications. The formality examination takes 3 months, and the content of the examination includes whether the applied for utility model patent application belongs to the object of protection, the issue of unity, etc. If the granted conditions are met, the patent is authorized.
- Features of the Bulgarian invention patent application process
- Novelty grace period for industrial design applications in Bulgaria
- How long does it take to grant a Bulgarian invention patent application
- Which is the competent authority for utility model applications in Bulgaria?
- What are the requirements for the utility model application documents in Bulgaria?
- Whether the Bulgarian invention patent application can be type-converted
- Is a Bulgarian industrial design application eligible for DAS?
- How long is the protection period of industrial design in Bulgaria?
- Can the priority right of Bulgarian invention patent application be restored?
- Is it possible to apply for a combined appearance for a Bulgarian industrial design application