OSIM conducts formality examination and substantive examination of design patent applications. The quality of the exterior design pictures must be guaranteed, and OSIM only accepts pictures or paper copies in .gif format. Applicants may apply for a deferment of publication, but not later than 30 months after the filing date. Within two months after publication, any third party may raise objections and provide evidence, and OSIM will convey the third-party public opinions to the applicant, and the applicant shall reply within two months from receiving the notification. Within three months of the objection being filed, OSIM will issue a report agreeing or denying the objection, which will be considered in the substantive examination.
- How long does it take for Romania utility model application to be granted?
- Is a Romanian industrial design application eligible for DAS?
- What are the requirements for utility model application documents in Romania?
- Novelty grace period for industrial design applications in Romania
- Romania Utility Model Application Authorization and Annual Fee Instructions
- How long is the protection period of industrial design in Romania?
- How many years is the protection period for utility model applications in Romania?
- Features of Romanian design patent application process
- How long does it take to authorize an industrial design in Romania?
- How long is the application period for industrial design in Romania?