Which is the competent authority for utility model patent applications in Mongolia?

Submitted by 页之码 on

Mongolian Intellectual Property Office

English: Intellectual Property Office of Mongolia, Abbreviation: IPOM

Website: Улсын бүртгэлийн ерөнхий газар (burtgel.gov.mn)

专利申请流程

  • To accept the restoration of the right of priority, please consult IPOM about the applicable standards and/or charges.

  • IPOM conducts formality examination and substantive examination for design patent applications. After the applicant successfully submits the application and pays the application fee to determine the application date, IPOM will conduct substantive examination to confirm that the design meets the requirements of novelty, originality and aesthetic feeling. Applicants are not required to submit a specific request for substantive examination.

  • 10 years

  • no

  • Filing Language: Mongolian

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    5. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entering the national phase of Mongolia 19/28/34/41 amended
    4. Power of Attorney
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
    • Grant fee: The applicant should pay the granted fee within 6 months after receiving the patent granted decision, and pay the annual fee for the first to third years in one lump sum.
    • Annuity: The annual fee after granted should be paid within 6 months before the start of the next valid period. Overdue payment can be made within a grace period of 6 months, but a 100% penalty must be paid at the same time.
  • no

  • IPOM conducts formality examination of utility model patent applications, and only requires novelty and practicality for utility model patent applications.

  • yes. An invention patent application can be converted from an invention to a utility model before the granted, and the filing date of the first application shall be the filing date of the converted patent application.

  • Filing Language: Mongolian

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Microorganism Preservation and Mongolian Translation
    3. Microorganism Survival Certificate and Mongolian Translation
    4. Power of Attorney
    5. Certified Priority Document
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer
    8. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entering the national phase of Mongolia 19/28/34/41 amended
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Microorganism Preservation and Mongolian Translation
    6. Microorganism Survival Certificate and Mongolian Translation
    7. Power of Attorney
    8. Declaration of Ownership/Certification of Employment/Assignment of priority
    9. Assignment for Patent Right Transfer