- Grant fee: The announcement fee includes the granted official fee.
- Annuity: pay year by year from the second year of the application date, and should be paid on the date of the application date. If the annual fee is overdue, it can be paid within a grace period of 6 months, and at the same time pay 160.00 Bahraini dinar (large entity) late fee.
- Can the priority right of utility model application in Bahrain be restored?
- How long is the protection period for utility model applications in Bahrain?
- Is a utility model application in Bahrain eligible for DAS?
- Novelty Grace Period for Bahrain Invention Patent Application
- Whether Bahrain invention patent application can be type-converted
- What are the requirements for Bahrain design application documents
- How long does it take to apply for authorization of utility models in Bahrain?
- What are the requirements for utility model application documents in Bahrain
- Whether Bahrain invention patent application can be DAS
- How long does it take to authorize an industrial design in Bahrain?