yes
- Authorization Fee: None
- Annuity: The annual fee is paid every 5 years. The overdue annual fee can be paid within a grace period of up to six months after the due date, and a 20% late fee will be paid at the same time. Pay within the first 3 months of the grace period with no late fees.
via Paris Convention : 12 months from earliest priority date.
via Nationalization of PCT : 30 months from the earliest priority date.
Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Filing Language: German Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
1 month
yes. Before the patent is granted/rejected, the patent type can be changed from invention to utility model at the request of the applicant. Can only be converted once.
- Authorization Fee: None
- Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.
- Authorization Fee: None
- Annuity: After the granted, it will be paid year by year from the 6th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. There is no late fee for the first three months of the late payment period for the first annual fee (i.e. the sixth year).
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.