Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian Utility Model Patent Search: National Patents Search (patentamt.at)
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.
- Authorization Fee: None
- Annuity: After the granted, it will be paid year by year from the 6th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. There is no late fee for the first three months of the late payment period for the first annual fee (i.e. the sixth year).
yes
Filing Language: German
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the German national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
ATPO conducts formality examination only for utility model patent applications. Although ATPO searches utility model patent applications, the search results do not affect the grant results. The applicant may amend the patent application after receiving the search report.
Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian Utility Model Patent Search: National Patents Search (patentamt.at)
yes
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
- Authorization Fee: None
- Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.