10 years
no
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.
via Paris Convention : 12 months from earliest priority date.
via Nationalization of PCT : 30 months from the earliest priority date.
Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Filing Language: German Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian patent search for inventions: National Patents Search (patentamt.at)
ATPO conducts formality examination only for utility model patent applications. Although ATPO searches utility model patent applications, the search results do not affect the grant results. The applicant may amend the patent application after receiving the search report.
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
- Authorization Fee: None
- Annuity: After the granted, it will be paid year by year from the 6th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. There is no late fee for the first three months of the late payment period for the first annual fee (i.e. the sixth year).
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
The initial protection is 5 years, which can be renewed 4 times for a maximum protection of 25 years.