A novelty grace period of 6 months prior to the filing date/priority date may be granted if the invention is disclosed as a result of apparent misuse by the applicant or its former right holders, or if the invention is exhibited at an official or officially recognized exhibition.
ATPO conducts formality examination only for utility model patent applications. Although ATPO searches utility model patent applications, the search results do not affect the grant results. The applicant may amend the patent application after receiving the search report.
Filing Language: German
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its German Translation
- Certificate of Microbiological Survival and its German Translation
- Power of Attorney
- Scanned Copy of Certified Priority Document / DAS
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Austrian national phase 19/28/34/41 amended
- Sequence Listing (PDF format and TXT format)
- Certificate of Deposit of Microorganisms and its German Translation
- Certificate of Microbiological Survival and its German Translation
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
yes. Prior to patent grant/rejection, the patent type can be converted from utility model to invention at the request of the applicant. Can only be converted once.
10 years
1 month
ATPO only conducts formality examination of design patent applications.
via Paris Convention : 12 months from earliest priority date.
via Nationalization of PCT : 30 months from the earliest priority date.
Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian Utility Model Patent Search: National Patents Search (patentamt.at)
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.