1-2 years
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
Mexican Institute of Industrial Property
English: Mexican Institute of Industrial Property, abbreviation: IMPI
URL: www.impi.gob.mx
Mexican Invention Patent Search: Search -- FOLLOW (impi.gob.mx)
yes
yes. As long as the application is not abandoned, the patent type can be converted from invention to utility model within 3 months of filing the invention patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.
As a PCT filing office, it accepts the restoration of the right of priority on the grounds of "unintentional".
no
yes
IMPI conducts formal and substantive examinations of utility model patent applications. However, the requirements for substantive examination are relatively loose, only novelty and industrial applicability are required, but innovation is not required.
yes. As long as the application is not abandoned, the patent type can be converted from utility model to invention within 3 months of filing the utility model patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.
- IMPI conducts formal and substantive examinations of designs. Substantive examination begins automatically, without a request.